Clarity Engages. Understanding Unites. Confidence Moves Projects.

Real Image Solutions
Real Image Solutions
  • Home
  • About
  • Government Services
  • 123 BIM
    • 123BIM - CAD to Cloud
    • Florida 123BIM Projects
  • Road Safety
    • Road Safety Audit 3D
    • RSA 3D Videos
  • Visualization Gallery
    • 3D Typicals
    • Structures
    • Photo Simulation
    • Exhibits
    • Complete Streets
    • Marine
    • Architectual
    • Videos / Animations
    • Miscellaneous
  • Resources
    • Featured Projects
    • News & Technical Insights
    • Blogs

Government Services

Corp of Engineers

Charlotte International Airport

 New Orleans Storm Protection System 

We developed technical and PSA animations for Tetra Tech and the U.S. Army Corps of Engineers showcasing the post-Katrina Inner Harbor Navigation Canal Surge Barrier—the world’s largest continuous surge barrier. This 1.8-mile, $1.3B system, completed in 2013, protects New Orleans East, the 9th Ward, Me

 New Orleans Storm Protection System 

We developed technical and PSA animations for Tetra Tech and the U.S. Army Corps of Engineers showcasing the post-Katrina Inner Harbor Navigation Canal Surge Barrier—the world’s largest continuous surge barrier. This 1.8-mile, $1.3B system, completed in 2013, protects New Orleans East, the 9th Ward, Metro New Orleans, and St. Bernard Parish from storm surge and was first deployed during Hurricane Isaac in 2012.

Charlotte International Airport

Charlotte International Airport

New Terminal and Baggage Facility 

 From 2006 to 2016, Charlotte Douglas International Airport modernized its east-side terminal and baggage systems through a multi-phase expansion that enlarged the lobby, improved ticketing and concessions areas, and added new checked-baggage handling capacity. We produced a ~4-minute animation for this e

New Terminal and Baggage Facility 

 From 2006 to 2016, Charlotte Douglas International Airport modernized its east-side terminal and baggage systems through a multi-phase expansion that enlarged the lobby, improved ticketing and concessions areas, and added new checked-baggage handling capacity. We produced a ~4-minute animation for this effort, showing the project in aerial context, illustrating phased construction, and visualizing key exterior and interior improvements.


Shaw Air Force Base

Shaw Air Force Base

 New Library

The McElveen Library at Shaw Air Force Base was completed in 2007 at a cost of about $4.2 million and became one of the Air Force’s early LEED Silver–certified facilities, featuring energy-efficient roofing, reduced-water plumbing, and extensive construction-waste recycling. For this project, we produced a dedicated animation 

 New Library

The McElveen Library at Shaw Air Force Base was completed in 2007 at a cost of about $4.2 million and became one of the Air Force’s early LEED Silver–certified facilities, featuring energy-efficient roofing, reduced-water plumbing, and extensive construction-waste recycling. For this project, we produced a dedicated animation that visually “grew” the new building out of its construction drawings and included a fully textured walkthrough with real-world lighting to showcase the design’s materials, spatial layout, and architectural intent.

Capability Statement

UEI: LTGZGFXZJDP3 | CAGE Code: 878E7

  • Construction / Building: 236116, 236200, 236220
  • HVAC / Mechanical: 238220
  • Building Support & Inspection: 541310, 561790
  • Graphics / Visualization / CAD: 541330, 541512, 541370, 541611, 541922

Download PDF

About RIS Website

Copyright © 2025 Real Image Solutions - All Rights Reserved.

  • Privacy Policy

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept