Clarity Engages. Understanding Unites. Confidence Moves Projects.
Clarity Engages. Understanding Unites. Confidence Moves Projects.

New Orleans Storm Protection System
We developed technical and PSA animations for Tetra Tech and the U.S. Army Corps of Engineers showcasing the post-Katrina Inner Harbor Navigation Canal Surge Barrier—the world’s largest continuous surge barrier. This 1.8-mile, $1.3B system, completed in 2013, protects New Orleans East, the 9th Ward, Me
New Orleans Storm Protection System
We developed technical and PSA animations for Tetra Tech and the U.S. Army Corps of Engineers showcasing the post-Katrina Inner Harbor Navigation Canal Surge Barrier—the world’s largest continuous surge barrier. This 1.8-mile, $1.3B system, completed in 2013, protects New Orleans East, the 9th Ward, Metro New Orleans, and St. Bernard Parish from storm surge and was first deployed during Hurricane Isaac in 2012.

New Terminal and Baggage Facility
From 2006 to 2016, Charlotte Douglas International Airport modernized its east-side terminal and baggage systems through a multi-phase expansion that enlarged the lobby, improved ticketing and concessions areas, and added new checked-baggage handling capacity. We produced a ~4-minute animation for this e
New Terminal and Baggage Facility
From 2006 to 2016, Charlotte Douglas International Airport modernized its east-side terminal and baggage systems through a multi-phase expansion that enlarged the lobby, improved ticketing and concessions areas, and added new checked-baggage handling capacity. We produced a ~4-minute animation for this effort, showing the project in aerial context, illustrating phased construction, and visualizing key exterior and interior improvements.

New Library
The McElveen Library at Shaw Air Force Base was completed in 2007 at a cost of about $4.2 million and became one of the Air Force’s early LEED Silver–certified facilities, featuring energy-efficient roofing, reduced-water plumbing, and extensive construction-waste recycling. For this project, we produced a dedicated animation
New Library
The McElveen Library at Shaw Air Force Base was completed in 2007 at a cost of about $4.2 million and became one of the Air Force’s early LEED Silver–certified facilities, featuring energy-efficient roofing, reduced-water plumbing, and extensive construction-waste recycling. For this project, we produced a dedicated animation that visually “grew” the new building out of its construction drawings and included a fully textured walkthrough with real-world lighting to showcase the design’s materials, spatial layout, and architectural intent.
UEI: LTGZGFXZJDP3 | CAGE Code: 878E7
Copyright © 2025 Real Image Solutions - All Rights Reserved.